Earth Works

Roads and Infrastructure for Government Residential Division Project in South of Wukair – Package 2B Grading (QS036-Package 2B)

Birkat Al Awamer

← Back to Earth Works

Description

The scope was to excavate/fill up to the formation level for approximately 721 hectors at Wukair. The work comprises site clearance, excavation (Volume: 3,271,000 cum), disposal of excavated materials in the spoil area, crushing and treatment of unsuitable material to make it suitable for reuse to fill (Qty: 1,353,000 cum), filling (Qty: 3,030,000 cum), and preparation of the surface.