Design and Build of Education City Infrastructure and Utilities to the Tariq Bin Ziad

Education City

← Back to Road Works

Description

The scope of work is to develop design solutions and build all services including but not limited to: pedestrian and vehicle access; revisit and connect to existing utilities system; and networks availability covering the Domestic Water (DW); Irrigation Water; Firewater (FW); Chilled Water (CHW); Stormwater (SW); Foul Sewage (FS); accessibility and roads; street lighting; power; ICT and Telecom; Potable Water; BMS; SCADA; collection tanks and Foul Water tie-in connections and MV/LV surrounding the project and explore the optimum route based on the QAS School Package 2 Infrastructure & Utilities.